Abdul Karim Center
Abdul Karim Center (AKH) – Al Khobar
Elite Style Contracting participated in the Abdul Karim Center (AKH) project in Al Khobar, contributing to the delivery of specialized interior and finishing works for the development. The project required precise execution and high-quality materials to ensure durability, functionality, and premium finishing standards.
Working in collaboration with Shapoorji Pallonji Middle East LLC as the main contractor, Elite Style was responsible for executing several key construction and finishing packages. The scope included gypsum partitions and ceiling installations, BASF epoxy coating works for parking areas and driveways, texture painting, decorative wall and ceiling finishes, and Fosroc Nitoflor Levelcrete 600 flooring systems.
The project demanded strong coordination between contractors and technical teams to ensure seamless integration of interior finishes and specialized flooring systems. Through careful planning, quality craftsmanship, and strict adherence to construction standards, Elite Style successfully delivered high-performance finishing works that support the building’s operational requirements.
Project Highlights
- Gypsum partition and ceiling installations
- BASF epoxy coating for parking areas and driveways
- Decorative wall and ceiling finishing works
- Texture paint applications for architectural surfaces
- Fosroc Nitoflor Levelcrete 600 flooring system installation Project Overview
Project Overview
-
Client:
Abdul Karim Center (AKH) -
Location:
Al Khobar, Saudi Arabia -
Contract Type:
Design & Build -
Scope of Work:
Gypsum Partitions & Ceilings, BASF Epoxy Coating, Texture Paint, Decorative Walls & Ceilings, Fosroc Nitoflor Levelcrete 600 Flooring -
Project Status:
Completed